Data sourced from public government registers. Always verify directly with Queensland Building and Construction Commission before making hiring decisions. Read full disclaimer.

Licensed Builders in Nerang, QLD

132 Verified Browse all verified licensed builders serving Nerang and surrounding suburbs.
Data last updated: 14 February 2026 from Queensland Building and Construction Commission register

Builder Directory — Nerang, QLD

Licence15317713
ClassBuilder - Low Rise
Licence15238030
ClassBuilder - Open
Licence15197382
ClassBuilder - Low Rise
Licence1072999
ClassBuilder Restricted to Kitchen, Bathroom and Laundry Installation
Licence15185815
ClassBuilder - Low Rise
Licence53631
ClassBuilder - Open
Licence15235906
ClassBuilder - Low Rise
Licence15452813
ClassBuilder - Low Rise
Licence1106609
ClassBuilder - Low Rise
Licence15246078
ClassBuilder - Low Rise
Licence12271
ClassBuilder - Open
Licence15385085
ClassBuilder - Low Rise
Licence1209661
ClassBuilder - Low Rise
Licence15047291
ClassBuilder - Low Rise
Licence15141596
ClassBuilder - Low Rise
Licence1158137
ClassBuilder - Low Rise
Licence1151091
ClassBuilder - Open
Licence726329
ClassBuilder - Low Rise
Licence15024520
ClassBuilder - Low Rise
Licence15468061
ClassBuilder - Low Rise
Licence15364485
ClassBuilder - Low Rise
Licence1320277
ClassBuilder - Low Rise
Licence15132055
ClassBuilder - Low Rise
Licence15371125
ClassBuilder - Low Rise
Licence15543925
ClassBuilder - Open
Licence1191985
ClassBuilder - Low Rise
Licence15404573
ClassBuilder - Low Rise
Licence15049960
ClassBuilder - Open
Licence1051796
ClassBuilder - Open
Licence1144052
ClassBuilder - Open
Licence1100601
ClassBuilder - Low Rise
Licence1209136
ClassBuilder - Low Rise
Licence45151
ClassBuilder - Open
Licence15095092
ClassBuilder - Open
Licence1306925
ClassBuilder - Low Rise
Licence15288401
ClassBuilder Restricted to Structural Landscaping
Licence15258185
ClassBuilder - Low Rise
Licence15204865
ClassBuilder - Low Rise
Licence15206285
ClassBuilder - Medium Rise
Licence15535255
ClassBuilder - Open
Licence20976
ClassBuilding Design - Medium Rise
Licence15081944
ClassBuilder - Open
Licence15368557
ClassBuilder - Low Rise
Licence1210531
ClassFoundation Work (Piling and Anchors)
Licence24229
ClassBuilder - Open
Licence1011937
ClassBuilder - Open
Licence1157424
ClassBuilder - Open
Licence1161434
ClassBuilder - Low Rise
Licence1192716
ClassBuilder - Low Rise
Licence15322283
ClassBuilding Design - Low Rise
Licence15559213
ClassBuilder - Low Rise
Licence15267646
ClassBuilder - Low Rise
Licence15098760
ClassBuilder - Low Rise
Licence1034765
ClassBuilder - Low Rise
Licence15445947
ClassBuilder - Low Rise
Licence15246154
ClassBuilder - Low Rise
Licence22643
ClassBuilder - Low Rise
Licence15152665
ClassBuilder - Low Rise
Licence1317226
ClassBuilder - Open
John HartActive
Licence1201710
ClassBuilder - Low Rise
Licence893216
ClassBuilder - Low Rise
Licence1032939
ClassBuilding Design - Medium Rise
Licence1148717
ClassBuilder - Low Rise
Licence15474453
ClassBuilder - Low Rise
Licence1143392
ClassBuilder - Low Rise
Licence21485
ClassBuilder - Medium Rise
Licence25096
ClassBuilder - Medium Rise
Licence1238244
ClassSheds, Carports and Garages
Licence15060792
ClassBuilder - Low Rise
Licence15428899
ClassBuilding Design - Low Rise
Licence20514
ClassBuilder - Open
Licence728181
ClassBuilder - Low Rise
Licence1058456
ClassBuilder - Low Rise
Licence1238228
ClassBuilder - Low Rise
Licence1259761
ClassBuilder - Low Rise
Licence1266086
ClassBuilder - Open
Licence1077372
ClassBuilder - Open
Licence1138906
ClassBuilder - Open
Licence15359575
ClassBuilder - Low Rise
Licence1107911
ClassBuilder - Low Rise
Licence1163817
ClassBuilder - Open
Licence15010275
ClassBuilder - Open
Licence1156345
ClassBuilder - Low Rise
Licence1166213
ClassSheds, Carports and Garages
Licence727950
ClassBuilder - Open
Licence15259644
ClassBuilder - Open
Licence15040244
ClassBuilder - Low Rise
Licence731644
ClassSheds, Carports and Garages
Licence1230593
ClassBuilder - Medium Rise
Licence15332413
ClassBuilder - Low Rise
Licence15248603
ClassBuilder - Open
Licence15049509
ClassBuilder - Low Rise
Licence15523633
ClassBuilder - Low Rise
Licence17220
ClassBuilder - Open
Licence1180004
ClassCompleted Residential Building Inspection
Licence1158053
ClassBuilder - Open
Licence15223262
ClassBuilder - Open
Licence15119885
ClassBuilder Restricted to Kitchen, Bathroom and Laundry Installation
Licence15549355
ClassBuilder - Low Rise
Licence15116101
ClassBuilder - Project Management Services

Hiring a Builder in Nerang

Before hiring any builder in Nerang, use this checklist to protect yourself and ensure you're working with a properly licensed and insured professional.

  1. Verify their Home Warranty Insurance is current — For residential building work above the state threshold (e.g. $20,000 in NSW, $16,000 in VIC), the builder must hold Home Warranty Insurance (also called Home Building Compensation in NSW). Ask for the certificate before signing — it protects you if the builder dies, disappears, or becomes insolvent before defects are rectified.
  2. Ask to see their QBCC or equivalent financial standing — In Queensland and several other states, builders must meet minimum net tangible asset requirements. A builder who has recently had financial conditions placed on their licence may be at risk of insolvency. Check the public register for any conditions, sanctions, or disciplinary actions.
  3. Request a detailed scope of works, not just a lump-sum price — A one-line quote of "$350,000 for your renovation" tells you nothing. Insist on a fully itemised scope of works that lists each trade, materials, allowances, PC (prime cost) items, and provisional sums so you can compare quotes fairly and avoid surprise variations.
  4. Confirm how they handle variations and cost overruns — Variations are the number-one source of building disputes in Australia. Ask how changes are documented and priced, whether there is a margin applied to variations, and ensure the contract requires written approval before any variation work commences.
  5. Check their licence class matches the scale of your project — Builder licences are tiered by project scale — for example, QBCC offers Low Rise (up to 2 storeys), Medium Rise (up to 3 storeys), and Open (unrestricted). A builder licensed only for Low Rise cannot legally construct a three-storey townhouse. Verify the licence class on the relevant state register.
Pro Tip

Get at least three quotes and compare not just price, but response time, warranty on workmanship, and whether the quote includes parts.

Red Flags to Watch For
  • No Home Warranty Insurance certificate for work over the threshold — Builders are legally required to provide Home Warranty Insurance before starting residential work above the state threshold. If a builder says insurance "isn't needed" or asks you to split the contract to stay under the threshold, walk away — this is a serious red flag and may indicate they cannot obtain insurance.
  • Demands large upfront deposits beyond the legal limit — Most states cap the deposit a builder can request — for example, 5% in Victoria and 10% in NSW for contracts over $20,000. A builder requesting 30–50% upfront may have cash flow problems and could be using your deposit to fund other projects.
  • Reluctant to put the scope of works in writing — For residential building work above the relevant threshold, a written contract is a legal requirement in every state. A builder who resists putting the full scope, timeline, and payment schedule in writing is exposing you to variations, disputes, and limited legal recourse.
  • Multiple current disciplinary actions on the public register — Check the state licensing register (e.g. QBCC, NSW Fair Trading, VBA) for any directions to rectify, licence conditions, or complaint history. One resolved complaint is normal; multiple open actions suggest systemic quality or conduct issues.

Builder Licensing Requirements in Queensland

Licence Required

Licensing is managed by Queensland Building and Construction Commission (QBCC).

Licence Types

Builder — Open

Unrestricted building work including residential and commercial

Builder — Medium Rise

Building work up to 3 storeys

Builder — Low Rise

Building work up to 2 storeys

Key Requirements

  • Certificate IV in Building and Construction (CPC40120) or Diploma
  • Minimum 4 years industry experience (2 years in supervisory role)
  • QBCC financial requirements (minimum net tangible assets)

Penalties for unlicensed work

Unlicensed building work in QLD carries fines up to $46,575 for individuals. QBCC can also issue stop-work orders, direction to fix notices, and suspend or cancel licences.

Typical Builder Costs in QLD

Hourly Rate

$70 – $120

Callout Fee

$80 – $150

Common Jobs

JobCost Range
Deck construction (20-30sqm)$5000 – $15000
Bathroom renovation$15000 – $35000
Kitchen renovation$20000 – $50000

Related Directories

Builders in Nearby Suburbs

Other Trades in Nerang

Broader Areas

Frequently Asked Questions

What is the difference between a builder and a building contractor?

In most states, the terms are interchangeable for licensing purposes. A "builder" typically refers to someone who constructs or renovates buildings, while a "building contractor" holds the licence that allows them to contract for building work and engage subcontractors. Some states distinguish between a general contractor (whole-of-build) and a specialist or trade contractor (single trade like carpentry or tiling).

What does Home Warranty Insurance actually cover?

Home Warranty Insurance (known as Home Building Compensation in NSW) covers homeowners if the builder cannot complete the work or fix defects due to death, disappearance, or insolvency. It typically covers structural defects for 6 years and non-structural defects for 2 years after completion. It does not cover disputes about quality while the builder is still trading — that is handled through the building tribunal or commission.

How much does it cost to build a house per square metre in Australia?

As a rough guide, expect $1,800–$2,500 per square metre for a standard project home, $2,500–$3,500 for a custom design, and $3,500 or more for architecturally designed or high-specification builds. Costs vary significantly by state, site conditions, finishes, and market demand. Always get at least three detailed quotes for your specific plans and site.

Do I need council approval before my builder starts work?

For most building work beyond minor cosmetic changes, yes. You or your builder must obtain a building permit (or construction certificate in NSW) from council or a private certifier before work begins. Some minor works like garden sheds under a certain size may be exempt. Your builder should confirm permit requirements during the quoting stage.

What is a defects liability period?

The defects liability period is a window — usually 13 to 26 weeks after practical completion — during which the builder must return to fix any defects identified during a final inspection. It is separate from Home Warranty Insurance cover. Document all defects in writing during this period and issue a formal defect notice to the builder.

Can I act as an owner-builder instead of hiring a licensed builder?

Most states allow homeowners to act as their own builder by obtaining an Owner Builder Permit, but thresholds apply — for example, work over $10,000 in NSW or $11,000 in QLD. As an owner-builder you take on all legal responsibility for compliance, subcontractor management, and workplace safety. You must also disclose the owner-builder work when selling the property within 6 years in most states.

How do I verify a builder's licence in QLD?

You can verify any builder's licence using TradieVerify's free search tool or directly through the Queensland Building and Construction Commission register. Enter the builder's name or licence number to confirm their licence status, class, and any disciplinary history.

How many licensed builders are in Nerang?

There are currently 132 licensed builders registered in Nerang, QLD. This data is sourced directly from the Queensland Building and Construction Commission register and updated regularly.